NURJANNAH, NURJANNAH (2010) STUDI PENENTUAN PENGAMBILAN KEPUTUSAN PADA KETERLAMBATAN PROYEK (Studi Kasus Proyek Rehabilitasi Jaringan Irigasi Jurang Sate). S1 thesis, Universitas Mataram.
Text
COVER Skripsi-Q.docx Restricted to Repository staff only Download (100kB) |
|
Text
KATA PENGANTAR.docx Restricted to Repository staff only Download (32kB) |
|
Text
Bab I-III.docx Restricted to Repository staff only Download (610kB) |
|
Text
Bab IV.docx Restricted to Repository staff only Download (720kB) |
|
Text
Bab V.docx Restricted to Repository staff only Download (26kB) |
Abstract
Melaksanakan dan mengontrol pekerjaan berdasarkan hasil analisa Microsoft Project secara seksama diantaranya: lintasan kritis, schedule harian, tabel kebutuhan tenaga kerja, alat dan material.Kemudian dilakukan evaluasi terhadap progres pelaksanaan di lapangan.
Item Type: | Thesis (S1) |
---|---|
Keywords (Kata Kunci): | Melaksanakan dan mengontrol |
Subjects: | T Technology > T Technology (General) |
Divisions: | Fakultas Teknik |
Depositing User: | Imran SE |
Date Deposited: | 23 Apr 2019 03:39 |
Last Modified: | 23 Apr 2019 03:39 |
URI: | http://eprints.unram.ac.id/id/eprint/13538 |
Actions (login required)
View Item |