STUDI PENENTUAN PENGAMBILAN KEPUTUSAN PADA KETERLAMBATAN PROYEK (Studi Kasus Proyek Rehabilitasi Jaringan Irigasi Jurang Sate)

NURJANNAH, NURJANNAH (2010) STUDI PENENTUAN PENGAMBILAN KEPUTUSAN PADA KETERLAMBATAN PROYEK (Studi Kasus Proyek Rehabilitasi Jaringan Irigasi Jurang Sate). S1 thesis, Universitas Mataram.

[img] Text
COVER Skripsi-Q.docx
Restricted to Repository staff only

Download (100kB)
[img] Text
KATA PENGANTAR.docx
Restricted to Repository staff only

Download (32kB)
[img] Text
Bab I-III.docx
Restricted to Repository staff only

Download (610kB)
[img] Text
Bab IV.docx
Restricted to Repository staff only

Download (720kB)
[img] Text
Bab V.docx
Restricted to Repository staff only

Download (26kB)

Abstract

Melaksanakan dan mengontrol pekerjaan berdasarkan hasil analisa Microsoft Project secara seksama diantaranya: lintasan kritis, schedule harian, tabel kebutuhan tenaga kerja, alat dan material.Kemudian dilakukan evaluasi terhadap progres pelaksanaan di lapangan.

Item Type: Thesis (S1)
Keywords (Kata Kunci): Melaksanakan dan mengontrol
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik
Depositing User: Imran SE
Date Deposited: 23 Apr 2019 03:39
Last Modified: 23 Apr 2019 03:39
URI: http://eprints.unram.ac.id/id/eprint/13538

Actions (login required)

View Item View Item