INFRASTRUCTURE DEVELOPMENT IMPLEMENTATION STRATEGY FOR SLUM MANAGEMENT

Hasyir, Mohammad and Murtiadi, Suryawan and Akmaluddin, Akmaluddin (2022) INFRASTRUCTURE DEVELOPMENT IMPLEMENTATION STRATEGY FOR SLUM MANAGEMENT. International Journal of Social Science (IJSS), 2 (4). pp. 2019-2032. ISSN 2798-4079 (Online)

[img]
Preview
Text
Hasyir.pdf

Download (404kB) | Preview
Official URL: https://bajangjournal.com/index.php/IJSS

Abstract

Based on the West Lombok Regency Decree 2020, Gerung District is not included in the list of slum housing and slum settlement locations for the Program of 2020 - 2025. In fact, the Gerung District area is facing several settlement problems with poor conditions of house building, environmental road, drinking water supply, environmental drainage and waste management problem. In addition, non-physical conditions of social and economic have also involved to the problems. The purpose of this study is to develop the best concept and program so that this area becomes a slum-free settlement in 2025. This research applies the concept of how best to handle this area so that it becomes a slum-free settlement. The research used quantitative and qualitative research methods. Primary data collection is carried out by direct observation to field locations to obtain information and field problems. Interviews were conducted by selecting respondents based on their position. The types of questions are determined based on the needs of the analysis. The secondary data needed is existing settlement data, BPS statistical data on the condition of the local population, and the RTRW map of West Lombok Regency. Slum settlement standards are set based on the Regulation of the Minister of Public Works and Public Housing of the Republic of Indonesia Number 14/PRT/M/2018. The strategy for managing slum settlements are carried out using AHP (Analytical Hierarchy Process) and SWOT analysis methodology to get alternative strategic decisions. The results indicated that waste management condition has the highest score causing slums. The implementation strategy is divided into short-term (2023-2024), medium-term (2025-2029) and long-term (2030-2040) periods program. SOP (Standard Operational Procedure) is expected to be developed. Monitoring and coordination should be maintained periodically. The results are recommended for consideration of the West Lombok Regency Government and Stakeholders.

Item Type: Article
Keywords (Kata Kunci): Slums, Parameter Indicators, AHP, SWOT.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik
Depositing User: Dr. Suryawan Murtiadi
Date Deposited: 30 Mar 2023 04:22
Last Modified: 30 Mar 2023 04:22
URI: http://eprints.unram.ac.id/id/eprint/35957

Actions (login required)

View Item View Item