Sulistiyono Heri, Heri Sulistiyono and Salehudin, Salehudin and I Dewa, Gede Jaya Negara and Eko Pradjoko, Eko Pradjoko and Yasa Wayan I, I Wayan Yasa and Agustawijaya S Didi, Didi S Agustawijaya and Atas Pracoyo, Atas Pracoyo (2015) Laporan dan Kontrak Penelitian Hibbah Kompetitif - Penyusunan Rancangan Standar Perencanaan Teknis SDA WS Lombok dan WS Sumbawa. -. (Unpublished)
|
Text
LAPORAN PENELITIAN - PENYUSUNAN RANCANGAN STANDAR PERENCANAAN TEKNIS SDA WS LOMBOK DAN WS SUMBAWA.pdf Download (6MB) | Preview |
|
|
Text
MoU BWS NT-I dengan UNRAM.pdf Download (536kB) | Preview |
|
|
Text
SPK BWS NT I dengan FT UNRAM.pdf Download (6MB) | Preview |
|
|
Text
Surat Tugas.pdf Download (590kB) | Preview |
Item Type: | Other |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TC Hydraulic engineering. Ocean engineering |
Divisions: | Fakultas Teknik |
Depositing User: | Ph.D. Heri Sulistiyono |
Date Deposited: | 02 May 2023 03:21 |
Last Modified: | 07 Sep 2023 04:03 |
URI: | http://eprints.unram.ac.id/id/eprint/37203 |
Actions (login required)
View Item |