Kurniawan Putera Rudy, Rudy Putera Kurniawan and Yasa Wayan I, I Wayan Yasa and Saadi, Yusron Hasil Turnitin dan Peer Review - Optimalisasi Pelaksanaan Pekerjaan Terowongan Pengelak dan Pelimpah pada Bendungan Meninting. Bina Patria.
|
Text
Peer Review_Optimalisasi Pelaksanaan Pekerjaan Terowongan.pdf Download (492kB) | Preview |
|
|
Text
Turnitin_Optimalisasi Pelaksanaan Pekerjaan Terowongan.pdf Download (1MB) | Preview |
Official URL: http://binapatria.id/index.php/MBI/article/view/25...
Item Type: | Other |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TC Hydraulic engineering. Ocean engineering |
Divisions: | Fakultas Teknik |
Depositing User: | Yusron Saadi |
Date Deposited: | 25 Aug 2023 07:46 |
Last Modified: | 25 Aug 2023 07:46 |
URI: | http://eprints.unram.ac.id/id/eprint/42270 |
Actions (login required)
View Item |